What is required before starting work on an installation permit processed through the boiler section?

  1. Post the permit on-site

  2. Notify the local fire department

  3. Conduct a safety meeting

  4. Obtain additional permits

The correct answer is: Post the permit on-site

Before starting work on an installation permit processed through the boiler section, it is required to post the permit on-site. This requirement serves several important purposes. First, it ensures that all individuals who may work on or near the installation are aware that a permit has been issued and that the work is authorized. By posting the permit visibly at the work site, it communicates to workers and any interested parties that regulatory oversight is in place, enhancing safety and compliance. Additionally, having the permit on site allows for easy access to the information contained within it, such as any specific conditions or limitations associated with the permit. This availability can facilitate adherence to safety protocols and building codes. While notifying the local fire department, conducting a safety meeting, and obtaining additional permits might be necessary steps in some circumstances or for specific projects, the immediate requirement emphasized in this context is the posting of the permit at the installation site. This action aligns with standard practices in ensuring that all regulatory guidelines are followed from the outset of the project.